ARGUS EnterpriseARGUS Enterprise 10.1 and later
Why do my percentage rent numbers differ between ARGUS Enterprise and Valuation DCF?
Because the two products build the breakpoint from different components, and neither one is wrong.
ARGUS Developer
Should every cost line in ARGUS Developer use an S-curve?
No. The S-curve is the right default for construction and the wrong default for almost everything else.
Procore
Can I turn off RFI numbering by project stage in Procore once it is on?
No. Enabling Prefix RFI Numbers by Project Stage is irreversible, and Procore shows a confirmation dialog for that reason.
ARGUS EstateMaster DF
How do I hold one variable fixed in an ARGUS EstateMaster DF probability run?
Deselect Enable on that variable's row. That is the documented way to hold it fixed for the run.