Propfessor.
( Procore )

Can I turn off RFI numbering by project stage in Procore once it is on?

单个问题,详尽解答。

No. Enabling Prefix RFI Numbers by Project Stage is irreversible, and Procore shows a confirmation dialog for that reason.

The setting lives on the project level RFI settings page, alongside default turnaround, overdue reminders, response visibility and the email notification matrix. Everything else on that page can be changed back. This one cannot.

Decide it before the first RFI is raised, because the prefix changes how every number reads and how anybody searching for one will find it. If you are unsure, leave it off: an unprefixed scheme can be lived with, and a prefixed one cannot be undone.

上方所有高亮词汇均与软件界面显示的文字完全一致。

追问

这是其中一个问题。您的疑问可能就在下一个,而且通常是关于您的特定模型,而非本示例。

立即提问

范围涵盖 Procore。无需信用卡即可免费咨询 3 个问题。

了解更多 Procore 相关内容,或查看 所有已发布答案