Propfessor.
( Procore )

Can I turn off RFI numbering by project stage in Procore once it is on?

Eén vraag, volledig beantwoord.

No. Enabling Prefix RFI Numbers by Project Stage is irreversible, and Procore shows a confirmation dialog for that reason.

The setting lives on the project level RFI settings page, alongside default turnaround, overdue reminders, response visibility and the email notification matrix. Everything else on that page can be changed back. This one cannot.

Decide it before the first RFI is raised, because the prefix changes how every number reads and how anybody searching for one will find it. If you are unsure, leave it off: an unprefixed scheme can be lived with, and a prefixed one cannot be undone.

Elke hierboven gemarkeerde tekst is de exacte bewoording die op het scherm verschijnt.

Stel de vervolgvraag

Dit is slechts één vraag. Uw specifieke vraag volgt waarschijnlijk hierna en zal over uw eigen model gaan in plaats van dit voorbeeld.

Stel uw vraag

Gericht op Procore. U krijgt 3 vragen gratis, zonder betaalgegevens.

Meer over Procore, of bekijk alle gepubliceerde antwoorden.